Uploaded image for project: 'Nuxeo Studio'
  1. Nuxeo Studio
  2. NXS-4772

Do not generate assignees node variable

    XMLWordPrintable

    Details

    • Type: Improvement
    • Status: Resolved
    • Priority: Major
    • Resolution: Fixed
    • Affects Version/s: 73.14
    • Fix Version/s: 73.21
    • Component/s: Ergonomy / UX / UI
    • Tags:
    • Sprint:
      NOS 10.3.5
    • Story Points:
      2

      Description

      In Studio, when creating a workflow task, an assignees node variable is automatically created

      This is confusing users:

      • They think it has to be used instead of the actual assignees field in the task configuration
      • Or they think it's needed for technical reasons
      • It's even worse with Designer, when people generate the layout it creates an element for the assignees variable and people expect it to define who you're going to assign this task to

      TODO
      Remove the assignees node variable when drag and dropping new workflow nodes (= no impact on existing, only for new nodes created)

      AC

      • When I drag and drop a workflow task of any kind and look at the node variables, the list is empty

        Attachments

          Issue Links

            Activity

              People

              • Votes:
                0 Vote for this issue
                Watchers:
                2 Start watching this issue

                Dates

                • Created:
                  Updated:
                  Resolved:

                  Time Tracking

                  Estimated:
                  Original Estimate - Not Specified
                  Not Specified
                  Remaining:
                  Remaining Estimate - 0 minutes
                  0m
                  Logged:
                  Time Spent - 1 hour
                  1h